The school grounds for the new primary school are located in Hamburg-Harvestehude, a densely built-up residential area, and cover a total area of approximately 2,700 m² with two existing buildings. The main building (Building 02) is a former girls’ school dating from 1912, a four-storey, listed solid construction with a clinker brick façade and mansard roof. In 1972, the structure was supplemented by a reinforced concrete skeleton construction (Building 01) with a washed concrete façade and ribbon windows. The task is to restructure the space into a 2.5-stream primary school that enables contemporary all-day schooling. This requires a variety of measures and spatial restructuring. The holistic interior and exterior renovation will implement accessibility and inclusion requirements. In addition to the renovation, a new main entrance will be created in Building 01 with an adjoining administration zone, compartments will be formed, a second structural escape route will be constructed and the underground car park will be repurposed. For the listed building, colour analyses will be carried out in the original stairwells, the walls in the entrance area and the historic entrance doors, and a new colour concept will be developed. Likewise, the floor plans will largely be restored to their original condition and supplemented with new fixtures. In order to meet the EC 70 standard, the ceilings of the underground car park will be insulated and the flat roof will be converted into a green roof.
Size: 5.204 m² BGF
Services: LPH 1-8 (9)
Date: in Planung seit 2024
Use: Bildung
Client: SBH | Schulbau Hamburg
Visualisations: DFZ Architekten